Bentley Systems

Bentley Systems

Software Development

Exton, PA 249,087 followers

Advancing Infrastructure

About us

Bentley Systems (Nasdaq: BSY) is the infrastructure engineering software company. We provide innovative software to advance the world’s infrastructure – sustaining both the global economy and environment. Our industry-leading software solutions are used by professionals, and organizations of every size, for the design, construction, and operations of roads and bridges, rail and transit, water and wastewater, public works and utilities, buildings and campuses, mining, and industrial facilities. Our offerings, powered by the iTwin Platform for infrastructure digital twins, include MicroStation and Bentley Open applications for modeling and simulation, Seequent’s software for geoprofessionals, and Bentley Infrastructure Cloud encompassing ProjectWise for project delivery, SYNCHRO for construction management, and AssetWise for asset operations. Bentley Systems’ 5,000 colleagues generate annual revenues of more than $1 billion in 194 countries.

Website
http://www.bentley.com
Industry
Software Development
Company size
1,001-5,000 employees
Headquarters
Exton, PA
Type
Public Company
Founded
1984
Specialties
Computer aided design and engineering software development, CAD, engineering, Infrastructure, ProjectWise, Software, Modeling design, MicroStation, software development, Rail, Road, Microstation, BIM, iTwin Platform, and AssetWise

Products

Locations

Employees at Bentley Systems

Updates

  • View organization page for Bentley Systems, graphic

    249,087 followers

    Located in Northern Spain, the Vitoria-Bilbao-San Sebastian Elorrio highspeed rail line aims to reduce vehicle travel between the provincial capitals of the Basque Country. The rail line is part of the European Union's initiative to provide improved travel between Spain and France. The project includes building a tunnel and four viaducts - Zumelegui, Goikoa, Zabaleta Norte, and Zabaleta Sur. Once fully completed, the rail line will eliminate thousands of metric tons of carbon emissions. Engineering firm Sacyr, tasked with constructing the Zumelegui viaduct line, performed 3D modeling and analysis of the viaduct. Using Bentley software, the team determined that a successive cantilever method would provide the most optimal design and construction solution. This resulted in clash detection to anticipate and avoid issues, improving design accuracy and mitigating potentially costly and time-consuming errors on site. The new high-speed rail line will improve connections with the main Basque population nodes, enabling 220 km/h speed for passenger trains and 90 km/h speed for cargo trains. #railway #transportation #3Dmodeling #engineering #infrastructure #construction #spain #france

    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
  • View organization page for Bentley Systems, graphic

    249,087 followers

    All eyes are on Paris as the 2024 Olympics closing ceremony takes place today. But, did you know about the hidden gem beneath the city's iconic streets? A vast geothermal reservoir that provides low-energy heating to over 250,000 homes and even the Orly airport. Researchers from New Zealand's University of Auckland, in collaboration with the #geothermal consulting company Geofluid, used advanced modeling techniques to create a detailed picture of the reservoirs to optimize this renewable energy source. The team used Bentley software to build a geological model that helps understand pressure and temperature changes within the reservoir. This visualization tool is helping ensure sustainable management of the geothermal basin, contributing to Paris's zero-carbon heating goals. #energy #engineering #infrastructure #subsurface #geological #GeothermalEnergy #sustainability #Paris #Seequent

    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
  • View organization page for Bentley Systems, graphic

    249,087 followers

    Truck manufacturer SCANIA is making important contributions to the transition towards safer, more efficient and sustainable transportation.  Check out this test track, which is used to develop and test electric and autonomous technology for heavy vehicles. It has 19 kilometers of roads with more than 60 intersections and junctions. SCANIA hired AFRY to design the test area amid an 85-hectare facility in Södertälje, Sweden. The track will include a three-lane, high-speed oval vehicle test section, a mixed traffic area for simulating varying road conditions, a multifunction brake test area, and service areas for servicing, parking, and charging vehicles. The plan is to complete the facility by 2026. With the help of Bentley software, AFRY used 3D modeling to efficiently design the project, as changing any single element would impact numerous others. Detailed 3D models enriched with project data enabled them to verify the impact of design on the environment and calculate the amount of earthwork required. In the process, AFRY reduced the environmental footprint of the test track while providing long-term assistance with the development of vital, emission-free vehicle technology. #engineering #technology #infrastructure #roads #transportation

  • View organization page for Bentley Systems, graphic

    249,087 followers

    The Xi’an-Shiyan high-speed railway project is a 256-kilometer railway that will strengthen the connection between city clusters in the middle reaches of the Yangtze River to help revitalize rural areas and alleviate poverty. One of the “six longitudinal lines and four horizontal lines” planned for the railway network of Hubei Province, the project is part of China’s plans to expand its high-speed network to 50,000km by 2025. Once completed, it will form a channel from Wuhan to Xi’an, reducing travel time between the two cities to about 2 hours. #transportation #rail #railway #digitaltwin #china

  • View organization page for Bentley Systems, graphic

    249,087 followers

    California's EchoWater megaproject tackled Sacramento Valley's water scarcity by upgrading a wastewater treatment facility. In 2022, amidst a multi-year drought, the state recorded one of its driest years ever. 600 square miles of farmland in the valley had to be left fallow — with no crops planted — due to low water levels. The completion of this massive undertaking involved upgrading infrastructure to treat 135 million gallons of wastewater daily, ensuring a safe and reliable supply of water. Using Bentley software, engineering firm Project Controls Cube meticulously planned and managed 22 individual construction and design projects. The team created a digital twin of the EchoWater facility to prepare for and carry out all the tasks, identifying problems in advance and working in real time. This allowed them to complete the billion-dollar project on time and under budget, saving taxpayers $400 million (USD). EchoWater promises to revitalize the region’s water supply, including waterways and groundwaters. [Images: Aerial view of farmland, rivers, and landscape around Sacramento. EchoWater project area and 3D rendering courtesy of Regional San and Project Controls Cubed.] #engineering #wastewater #RegionalSan #ProjectControlsCubed #California

    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
  • View organization page for Bentley Systems, graphic

    249,087 followers

    Gear up for a transportation revolution under the Baltic Sea! The Fehmarnbelt Fixed Link is set to be the world's longest combined road and rail tunnel connecting Denmark and Germany when it opens in 2029. The tunnel will be constructed in massive 73,000-ton sections, each roughly half the length of the world's biggest container ship. These sections will be carefully positioned under the seabed, creating a new route for cars, trains, and freight. Once complete, travel times between Copenhagen and Hamburg is expected to be just 2.5 hours by train, compared to 4.5 hours today. Dive into this CNN article to learn more about the engineering and construction behind this marvel! https://cnn.it/3RPUpNE #engineering #infrastructure #construction #rail #denmark #germany #europe

    World's longest road and rail tunnel is being built under the Baltic Sea | CNN

    World's longest road and rail tunnel is being built under the Baltic Sea | CNN

  • View organization page for Bentley Systems, graphic

    249,087 followers

    Combining technology with sustainable urban planning, Kaunas University of Technology’s digital twin project is a catalyst for industry transformation and workforce development. The digital twin serves as a teaching mechanism for students in Lithuania who aspire to a career in the AEC sector. The project's footprint expands beyond KTU's campus and into Kaunas, Lithuania's second-largest city. While KTU's use of digital twins covers various use cases, reducing carbon emissions and enhancing the energy performance of the city's buildings remain core to their work. 📰 More at the link in the comments. #engineering #construction #architecture #education #workforcedevelopment #talentdevelopment #education Kaunas University of Technology

    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
  • View organization page for Bentley Systems, graphic

    249,087 followers

    Voting is OPEN for #SXSW 2025! Cast your vote for our #PanelPicker entry "Digital Twins & AI for Water Resilience". This panel features a stellar lineup of water industry leaders using cutting-edge technologies to ensure the sustainable management of water resources and safeguard public health. Help bring this important conversation to SXSW 2025. Upvote this session at the link in the comments. #waterresilience #watermanagement #climatechange #digitaltwins #AI #engineering #infrastructure #watersecurity Julien Moutte Will Sarni Satish Tripathi, PE,

    • No alternative text description for this image

Affiliated pages

Similar pages